Start with the owner and the opportunity
You do not need a chef background, but you must be willing to learn production, lead employees, maintain records and follow approved methods. Daily owner involvement is essential. The business cannot be handed to a hired manager and is not compatible with another full-time job.
Begin by completing the product evaluation, then submit an application. The evaluation lets you judge the food across separately prepared batches. Qualification, site feasibility and financial review address different questions and remain necessary before commitment.
Match the store format to the market
The Category A reference store is approximately 1,500 square feet, with designed production capacity of 300 pounds per day. Its layout includes production, storage, packaging and retail service, with 12 seats in the reference design. Production capacity is the amount the system is designed to make; it is not an estimate of sales.
Category B and C designs use smaller footprints of approximately 1,200 and 1,000 square feet. Confirm which formats are currently available and obtain the applicable approved investment and operating information before planning around them. The appropriate format depends on assessed demand, premises and total costs.
Build a complete opening budget
Detailed investment information is available during the product evaluation. Budget for the initial franchise fee, launch marketing, other start-up costs, build-out, equipment, pre-opening expenses and working capital. Review Items 5, 6 and 7 of the current Franchise Disclosure Document for applicable fees, estimated investment components and assumptions. Actual costs depend on the approved site and store format.
Build one complete opening budget and check which costs are already included in the total. Do not count launch marketing, equipment, opening inventory or working-capital allowances a second time.
Replace reference allowances with actual lease terms, contractor bids, equipment quotations and site-specific cash requirements. An existing restaurant may have useful infrastructure, but it must still meet the approved production and code requirements. The reference build-out contingency is preliminary; assess a realistic allowance for the actual premises.
The initial franchise fee includes owner training. Continuing royalties, applicable fees, required third-party services and local operating expenses must also be included in your financial planning. Review Items 5 and 6 of the current Franchise Disclosure Document and the proposed franchise agreement for the relevant fees and commitments.
Prepare funding and opening liquidity
Identify your available personal equity and financing needs before taking on site or construction obligations. A lender will assess the borrower, proposed site, costs, cash needs and ability to repay. Artees Sweets does not lend or guarantee a loan.
Assess the equity, borrowing and cash reserves needed for the approved store. Actual loan terms, guarantees and approval depend on the lender. Review Item 10 of the current Franchise Disclosure Document for financing disclosures.
Prepare personal financial records, evidence of funding sources, the proposed entity and ownership details, cost quotations, site information and a customized business plan. Allow for pre-opening wages, training travel, deposits, inventory, delays and a slower sales ramp. Cash for opening operations is as important as money for construction and equipment.
Assess local demand and propose a site
Assess the trade area: customers familiar with South Asian sweets, relevant community activity, competing products and prices, access, delivery reach and realistic purchasing patterns. Core products serve an established category; Gateway products and Global Classics create ways to reach additional customers.
Artees reviews customer concentration, modeled demand, rent, utilities and operating feasibility. Existing competitors can indicate category familiarity while also competing for the same customers. Product quality and a relevant population do not establish that a particular site will attract enough sales.
Submit photographs, a measured plan, proposed lease terms, all occupancy charges, utility details, current use, known violations and landlord restrictions. Written approval or conditions follow the required review. Obtain required approval before making a binding site commitment, and have your own attorney review the lease.
Verify the premises before build-out
Confirm electrical capacity for the approved equipment, ventilation and HVAC, water, drainage, sanitation areas, cold storage, delivery access and permitted food use. Consider signage rights, construction access, accessibility, waste handling and landlord consent.
Artees provides layout and system requirements and reviews plans for conformity. Licensed architects, engineers and contractors complete professional design and construction. The owner obtains permits, funds the work and manages contracts and payments. Site approval does not remove the need for code compliance or professional review.
Prepare the owner employees and operating systems
The owner completes 28 days of training, approximately 224 hours, and must pass the required opening assessment. Artees trains the owner; the owner trains employees for assigned work without giving them complete formulations or owner-only procedures.
Plan staffing for production, packaging, customer service, opening hours and days off. The reference structure shows the owner plus seven operating positions. Operating positions and total payroll headcount are different measures; the approved staffing plan must cover the actual schedule.
Before opening, arrange approved suppliers and opening stock, equipment testing and calibration, POS and payment testing, insurance, food-safety procedures, logs and reporting access. Employee preparation and test production must be completed in time for readiness review.
Coordinate the opening schedule
The reference schedule is approximately 26 weeks across qualification and opening preparation, but timing depends on disclosure, site approval, financing, permits, construction and certification. Agree a site-specific schedule rather than treating the reference as a guaranteed opening date.
Design, procurement, construction, training and marketing may overlap. Artees plans and executes the launch campaign during the 30 days before opening and the 30 days after opening. Coordinate the launch date with operating readiness so announcements and product activities are supported by a prepared store.
Complete the opening gate and early operating ramp
Artees reviews legal and funding readiness, premises, equipment, permits, insurance, owner certification, employee preparation, stock, POS, food safety and brand materials. Trial production and a service dry run identify deficiencies that must be corrected before written opening clearance.
A controlled soft launch checks throughput, product consistency, service and staffing before the grand opening. The owner then completes a 90-day operational ramp with Artees support. Review early demand, waste, costs, quality and customer feedback, and take approved corrective action when needed.
Review the documents before committing
Review the FDD, proposed agreement, site assessment, cost estimates, financing, ownership duties and support commitments with independent advisers. Product preference does not establish future sales, and production capacity does not establish profitability. Financial performance information must be assessed through the applicable FDD disclosure.
Use the Marketing and Launching page for campaign details and the Franchisee Support Guide for the assistance available before and after opening.
Planning Your Store · Marketing and Launching · Franchisee Support Guide